Form Center

By signing in or creating an account, some fields will auto-populate with your information and your submitted forms will be saved and accessible to you.

Fire Protection Permit Application

Steps

  1. 1. Step One
  2. 2. Step Two
  • Step One

    1. Letterhead_FD_NEW

    2. A permit is required for all fire protection systems per UFC section 501.2

    3. Do you need your plans expedited?

    4. This is an application for a Fire Protection System Permit requested in accordance with Unified Fire Code, Section 501.2 and Ohio Fire Code, Sections 502.1 and 104.2. Additionally:

    5. 1. Issued permits shall be kept on the premises designated therein at all times and shall be readily available for inspection by the code official according to UFC Section 107.3

    6. 2. Applications for permits shall be accompanied by ONE SET of construction documents or site plans, as required by the code official for evaluation of the application according to UFC Section 107.3.1

    7. 3. An application for a permit for any proposed work or operation shall be deemed to have been abandoned six months after the date of filing, unless such application has been diligently prosecuted or a permit shall have been issued; except that the code official shall grant one or more extensions of time for addition periods not exceeding 90 days each if there is reasonable cause according to UFC Section 107.3.2.